The figures below are indicative ranges for complete, commissioned grid-connected systems, in Moldovan lei, including VAT. They are published so you can judge whether a project is worth pursuing before you spend time on a survey. A binding price comes only from a fixed-price offer after we have seen the roof.

Indicative ranges by system size

System sizeTypical modulesIndicative annual yieldTurnkey price range (MDL, VAT included)
3 kW7 modules3,400–3,900 kWh58,000 – 72,000
5 kW11–12 modules5,700–6,500 kWh86,000 – 108,000
10 kW22–24 modules11,400–13,000 kWh152,000 – 190,000

Where a project lands inside its range depends mainly on the roof. A simple, accessible metal-sheet pitch sits near the bottom of the band. A tile roof needing individual hanger bolts, a two- or three-plane layout, a long cable run to the consumer unit, or a roof that requires scaffolding rather than a ladder will push a project towards the top of it.

What is included

What is not included

Payment terms

Our standard schedule for residential work is 40 percent on signature of the contract, 50 percent on delivery of the equipment to site, and the remaining 10 percent on commissioning and handover. The final tranche is not due until the system is producing and you have the handover pack in your hands.

We accept bank transfer to our account at a Moldovan commercial bank. We do not take cash for amounts above 10,000 MDL. Invoices are issued in MDL; where a customer prefers a euro-denominated contract we can do that, converted at the National Bank rate on the day of each invoice.

Lead time

From a signed contract and cleared deposit, delivery and installation typically take three to four weeks. Grid connection paperwork runs in parallel with that period. Installation itself is one to three working days on site for a residential system of this size.

Validity

Fixed-price offers are valid for 30 days. The ranges on this page are reviewed quarterly and were last updated in July 2026; module and inverter prices move with the euro exchange rate, so treat them as a guide rather than a quotation.